Projects

 

Соmpleted projects

  • Overhaul of a draw-span of the vertical lift-bridge over the Neva, 5 km of the Finlyandskaya connection line.
  • Replacement of the power cables of the combined draw/vertical lift-bridge over the Svir in Lodejnoe Pole.
  • Overhaul of the draw-cable system and wedging equipment for the vertical railroad drawbridge over the Svir, 284 km of the Olonets-Lodejnoe Pole leg.
  • Repair of winch drives of the two-track vertical railroad drawbridge over the Don, 1,384 km of the Severo-Kavkazskaya Railroad.
  • Design of the overhaul of the rollback-opening bridge over the Belomor-Baltic Canal, 14 km on the Belomorsk-Malenga leg.
  • Design of the overhaul of a draw-span of the vertical drawbridge over the Neva in Pavlovo-on-Neva.
  • A scow for the MSK-2x1250 pile driver for the new MSK-1M pile driving modules.
  • NZhM-56 floating railroad bridge. A test unit of the MLZh-VF-VT unified floating railroad tape-bridge with a rated capacity of withstanding trains using the VT car load scheme. The bridge has successfully passed the national tests and is recommended for mass manufacture. For the design of the bridge, the chief designer of the project, S. Yefimkin, was awarded a national prize in the area science and technology.
  • Redesign of the Typical Solutions of Temporary Railroad Bridges, Part III, Basic Data on Structures and Mechanisms album. The album has the basic specifications for spans, supports, and bases necessary for designing schemes of modern bridges, as well as specifications of mechanisms and equipment used in building bridges. The album has been augmented with technical documentations developed by R&D organizations at the request of FSZhV RF since the previous publication.
  • Overhaul of the drive of the railroad drawbridge over the Belomor-Baltic Canal in Belomorsk.
  • A set of equipment for operating the passage drawbridge of the railroad ferry dock in Ust-Luga.
  • Overhaul of the mechanisms of track I of the Finlyandsky railroad bridge over the Neva in St. Petersburg.
  • The drive mechanisms of a drawbridge through navigable construction С-2 of the complex of constructions for Saint - Petersburg protection from flooding.
  • Overhaul of the mechanisms of the railroad drawbridge over the Neva in Pavlovo-on-Neva.
  • The designing of the major overhaul of a drawbridge mechanisms through a sluice of №2 Belomoro - the Baltic Canal in Medvezhyegorsk town.
  • The technical support of the city embankment building of 1300 m length in Astrakhan.
  • The electrified observation cart for the bridge through “Moscow” canal in Himki.
  • The reconstruction of the road bridge in Venspils city.
  • Inspection of Dvortsovy bridge (St.Petersburg) drive condition.

 

Facilities under construction

  • The designing of the major overhaul of the drawbridge through Svir’ river on 284 km of Saint – Petersburg – Murmansk line near Podporozhye town.
  • Design work for bridge No. 5 (Dnepropetrovsk) machinery repair.

 

Prospective projects

  • The major overhaul of a mechanisms of the draw span of Finlyandskiy bridge (1 st track).
  • Renovation of machinery for railway drawbridge across Svir river (Podporozhye) 
  • Renovation of machinery for combined drawbridge across Svir river (Lodeinoe Pole).
  • Renovation of two railway bridges in Dnepropetrovsk
  • Renovation of machinery for combined drawbridge across Severnaya Dvina river (Arkhangelsk).